SFY

ArcelorMittal Nippon Steel India

BRSR Verified
GujaratBF-BOF9 MTPABSE: | NSE:

17.14 Mt

Total Scope 1+2 (FY 2024-25)

↑13%

Scope 1

15.85 Mt

Direct emissions

Scope 2

1.29 Mt

From purchased energy

Intensity

2.180 tCO2e/tonne crude steel

tCO2e/tonne crude steel

Renewable

N/A

Of energy consumed

Emissions Trend

Scope 1 Scope 2
05.0M10.0M15.0M20.0MFY '22-2315.2MFY '23-2416.9M▲ 11.1%FY '24-2517.1M▲ 1.3%

Year-by-Year Data

FYScope 1Scope 2IntensityAssuranceSource
2022-2313.08 Mt2.15 MtN/APDF
2023-2415.27 Mt1.65 Mt2.170 tCO2e/tonne crude steelReasonablePDF p.131
2024-2515.85 Mt1.29 Mt2.180 tCO2e/tonne crude steelReasonablePDF p.131

Climate Commitments

Net Zero Target2050

20% emissions intensity reduction by 2030 to 1.8 tCO2/tcs (base 2021). Already achieved 33% intensity reduction since 2015.

renewable energygreen hydrogencarbon captureenergy efficiency
Source

Satellite Estimate

Climate TRACE

2023

9.34 Mt

1 facility matched (medium confidence)

Facility: ArcelorMittal Nippon Steel Hazira plant

Note: Climate TRACE tracks individual facilities via satellite, while BRSR covers company-wide operations. Differences are expected and don't indicate errors.

Company Details

Sector
steel
State
Gujarat
Production Route
BF-BOF
Capacity
9 MTPA
BSE Code
NSE Symbol
Assurer
Bureau Veritas (India) Private Limited
Boundary
standalone

Verified against filing

These numbers have been verified against the company's BRSR filing on BSE/NSE with source page references.

All emissions figures are as reported by the company in their BRSR filing to BSE/NSE. Climate TRACE estimates are independent satellite-based calculations. Full methodology →

Report an error in this data

Found an error in this data? We verify every number against the original BRSR filing. Report a correction →