SFY

HeidelbergCement India Limited

Madhya Pradeshclinker-kiln6.26 MTPABSE:500292 | NSE:HEIDELBERG

3.36 Mt

Total Scope 1+2 (FY 2023-24)

Scope 1

3.20 Mt

Direct emissions

Scope 2

160.0 kt

From purchased energy

Intensity

530.000 kgCO2e/tonne cementitious material

kgCO2e/tonne cementitious material

Renewable

N/A

Of energy consumed

Emissions Trend

Scope 1 Scope 2

FY 2023-24

3.36 MttCO2e total
Scope 1
Scope 1: 3.20 Mt (95%)Scope 2: 160K (5%)

Year-by-Year Data

FYScope 1Scope 2IntensityAssuranceSource
2023-243.20 Mt160.0 kt530.000 kgCO2e/tonne cementitious materialPending

Satellite Estimate

Climate TRACE

Facility matching in progress

Company Details

Sector
cement
State
Madhya Pradesh
Production Route
clinker-kiln
Capacity
6.26 MTPA
BSE Code
500292
NSE Symbol
HEIDELBERG
Boundary
standalone

All emissions figures are as reported by the company in their BRSR filing to BSE/NSE. Climate TRACE estimates are independent satellite-based calculations. Full methodology →