Orient Cement Limited
Telanganaclinker-kiln8.5 MTPABSE:535754 | NSE:ORIENTCEM
4.21 Mt
Total Scope 1+2 (FY 2023-24)
Scope 1
4.01 Mt
Direct emissions
Scope 2
200.0 kt
From purchased energy
Intensity
587.000 kgCO2/tonne cementitious material
kgCO2/tonne cementitious material
Renewable
N/A
Of energy consumed
Emissions Trend
Scope 1 Scope 2
FY 2023-24
4.21 MttCO2e total
Scope 1
Scope 1: 4.01 Mt (95%)Scope 2: 200K (5%)
Year-by-Year Data
| FY | Scope 1 | Scope 2 | Intensity | Assurance | Source |
|---|---|---|---|---|---|
| 2023-24 | 4.01 Mt | 200.0 kt | 587.000 kgCO2/tonne cementitious material |
Satellite Estimate
Climate TRACE2023
1.58 Mt
1 facility matched (medium confidence)
Facility: Orient Cement Chittapur Cement Plant
Note: Climate TRACE tracks individual facilities via satellite, while BRSR covers company-wide operations. Differences are expected and don't indicate errors.
Company Details
- Sector
- cement
- State
- Telangana
- Production Route
- clinker-kiln
- Capacity
- 8.5 MTPA
- BSE Code
- 535754
- NSE Symbol
- ORIENTCEM
- Boundary
- standalone
All emissions figures are as reported by the company in their BRSR filing to BSE/NSE. Climate TRACE estimates are independent satellite-based calculations. Full methodology →