Prism Johnson Limited
3.15 Mt
Total Scope 1+2 (FY 2023-24)
Scope 1
3.00 Mt
Direct emissions
Scope 2
150.0 kt
From purchased energy
Intensity
550.000 kgCO2e/tonne cementitious material
kgCO2e/tonne cementitious material
Renewable
N/A
Of energy consumed
Emissions Trend
FY 2023-24
Year-by-Year Data
| FY | Scope 1 | Scope 2 | Intensity | Assurance | Source |
|---|---|---|---|---|---|
| 2023-24 | 3.00 Mt | 150.0 kt | 550.000 kgCO2e/tonne cementitious material |
Satellite Estimate
Climate TRACE2023
1.54 Mt
1 facility matched (medium confidence)
Facility: Prism Johnson Mankahari Cement Plant
Note: Climate TRACE tracks individual facilities via satellite, while BRSR covers company-wide operations. Differences are expected and don't indicate errors.
Company Details
- Sector
- cement
- State
- Maharashtra
- Production Route
- clinker-kiln
- Capacity
- 5.9 MTPA
- BSE Code
- 500338
- NSE Symbol
- PRSMJOHNSN
- Boundary
- standalone
Pending verification
These numbers have NOT been independently verified against the original BRSR filing. They may contain errors. We are actively verifying all companies — check back soon.
All emissions figures are as reported by the company in their BRSR filing to BSE/NSE. Climate TRACE estimates are independent satellite-based calculations. Full methodology →
Report an error in this dataFound an error in this data? We verify every number against the original BRSR filing. Report a correction →