The Sandur Manganese & Iron Ores Limited
Karnatakamanganese-iron-ore2.5 MTPABSE:504918 | NSE:SANDUMA
735.0 kt
Total Scope 1+2 (FY 2023-24)
Scope 1
650.0 kt
Direct emissions
Scope 2
85.0 kt
From purchased energy
Intensity
N/A
tCO2e/tonne ore
Renewable
N/A
Of energy consumed
Emissions Trend
Scope 1 Scope 2
FY 2023-24
735KtCO2e total
Scope 1
Scope 1: 650K (88%)Scope 2: 85K (12%)
Year-by-Year Data
| FY | Scope 1 | Scope 2 | Intensity | Assurance | Source |
|---|---|---|---|---|---|
| 2023-24 | 650.0 kt | 85.0 kt | N/A |
Satellite Estimate
Climate TRACEFacility matching in progress
Company Details
- Sector
- mining
- State
- Karnataka
- Production Route
- manganese-iron-ore
- Capacity
- 2.5 MTPA
- BSE Code
- 504918
- NSE Symbol
- SANDUMA
- Boundary
- standalone
All emissions figures are as reported by the company in their BRSR filing to BSE/NSE. Climate TRACE estimates are independent satellite-based calculations. Full methodology →