Tata Power Company Limited
BRSR Verified28.65 Mt
Total Scope 1+2 (FY 2025-26)
↓36%Scope 1
26.07 Mt
Direct emissions
Scope 2
2.59 Mt
From purchased energy
Intensity
0.001 tCO2e/kWh
tCO2e/kWh
Renewable
N/A
Of energy consumed
Emissions Trend
Climate Commitments
SBTi-validated. Net zero across Scope 1, 2 & 3 by 2045. 70.5% Scope 1 reduction per MWh by FY2037. 70% renewable capacity by 2030.
Satellite Estimate
Climate TRACE2023
35.42 Mt
2 facility matched (medium confidence)
Note: Climate TRACE tracks individual facilities via satellite, while BRSR covers company-wide operations. Differences are expected and don't indicate errors.
Company Details
- Sector
- power
- State
- Maharashtra
- Production Route
- mixed
- Capacity
- 14,700 MW
- BSE Code
- 500400
- NSE Symbol
- TATAPOWER
- Assurer
- TUV India Pvt. Limited
- Boundary
- consolidated
Verified against filing
These numbers have been verified against the company's BRSR filing on BSE/NSE with source page references.
All emissions figures are as reported by the company in their BRSR filing to BSE/NSE. Climate TRACE estimates are independent satellite-based calculations. Full methodology →
Report an error in this dataFound an error in this data? We verify every number against the original BRSR filing. Report a correction →