SFY

Torrent Power Limited

Gujaratmixed4,961 MWBSE:532779 | NSE:TORNTPOWER

6.77 Mt

Total Scope 1+2 (FY 2023-24)

Scope 1

5.25 Mt

Direct emissions

Scope 2

1.52 Mt

From purchased energy

Intensity

N/A

tCO2e/MWh

Renewable

38.0%

Of energy consumed

Emissions Trend

Scope 1 Scope 2

FY 2023-24

6.77 MttCO2e total
Scope 1
Scope 2
Scope 1: 5.25 Mt (78%)Scope 2: 1.52 Mt (22%)

Year-by-Year Data

FYScope 1Scope 2IntensityAssuranceSource
2023-245.25 Mt1.52 MtN/ALimitedPDF

Satellite Estimate

Climate TRACE

Facility matching in progress

Company Details

Sector
power
State
Gujarat
Production Route
mixed
Capacity
4,961 MW
BSE Code
532779
NSE Symbol
TORNTPOWER
Assurer
Grant Thornton Bharat LLP
Boundary
standalone

Pending verification

These numbers have NOT been independently verified against the original BRSR filing. They may contain errors. We are actively verifying all companies — check back soon.

All emissions figures are as reported by the company in their BRSR filing to BSE/NSE. Climate TRACE estimates are independent satellite-based calculations. Full methodology →

Report an error in this data

Found an error in this data? We verify every number against the original BRSR filing. Report a correction →