SFY

Vedanta Power Limited

Punjabthermal-coal4,200 MWBSE:544781 | NSE:VEDPOWER

25.00 Mt

Total Scope 1+2 (FY 2023-24)

Scope 1

25.00 Mt

Direct emissions

Scope 2

Not disclosed

From purchased energy

Intensity

N/A

Per unit output

Renewable

N/A

Of energy consumed

Emissions Trend

Scope 1 Scope 2

FY 2023-24

25.00 MttCO2e total
Scope 1
Scope 1: 25.00 Mt (100%)Scope 2: 0 (0%)

Year-by-Year Data

FYScope 1Scope 2IntensityAssuranceSource
2023-2425.00 MtNot disclosedN/APDF

Satellite Estimate

Climate TRACE

2022

24.74 Mt

1 facility matched (high confidence)

Facility: Tamnar Power Station

Note: Climate TRACE tracks individual facilities via satellite, while BRSR covers company-wide operations. Differences are expected and don't indicate errors.

Company Details

Sector
power
State
Punjab
Production Route
thermal-coal
Capacity
4,200 MW
BSE Code
544781
NSE Symbol
VEDPOWER
Boundary
standalone

Pending verification

These numbers have NOT been independently verified against the original BRSR filing. They may contain errors. We are actively verifying all companies — check back soon.

All emissions figures are as reported by the company in their BRSR filing to BSE/NSE. Climate TRACE estimates are independent satellite-based calculations. Full methodology →

Report an error in this data

Found an error in this data? We verify every number against the original BRSR filing. Report a correction →