When we finished verifying emissions data for 32 of India's largest industrial companies, one number stopped us cold.
352.5million tonnes CO2
NTPC Limited, FY 2023-24 — verified from BRSR filing (NSE, page 282)
That's the annual carbon dioxide output of a single company: NTPC Limited, India's state-owned power giant. To put that in perspective, it is more than the combined verified emissions of every steel and cement company in our database — all 13 of them.
Tata Steel, JSW Steel, JSPL, Jindal Stainless, Ambuja Cements, ACC, Dalmia Bharat — add all of their verified emissions together, and you still don't reach NTPC's number.
NTPC vs Entire Sectors
Annual Scope 1 + Scope 2 emissions, million tonnes CO2e. Verified companies only.
Source: Company BRSR filings (BSE/NSE). Sector totals include only companies whose latest filing has verified data. Steel: Tata Steel, JSW Steel, JSPL, Jindal Stainless. Cement: Ambuja, ACC, Dalmia Bharat, Ramco, J.K. Cement, Nuvoco, India Cements, Heidelberg, Orient. Aluminium: Vedanta, Hindalco, NALCO. NTPC figure: FY2023-24. Full list
The Scale of the Problem
NTPC operates 75,958 MW of installed capacity, making it India's largest power producer. The vast majority of this runs on coal. Its emission intensity sits at 835 grams of CO₂ per kilowatt-hour, roughly double the global average for power generation (423 g/kWh in 2023, per the IEA).
In FY 2022-23, NTPC emitted 335.7 million tonnes. By FY 2023-24, that rose to 352.5 million tonnes — an increase of 16.8 million tonnes in a single year. That one-year increase alone is more than the total annual emissions of JSPL, one of India's top five steel companies.
Of the 971 million tonnes of annual CO₂ we track across verified companies in 6 sectors, NTPC alone accounts for 36%.
NTPC's annual emissions of 352 million tonnes are more than those of Tata Steel, JSW Steel, JSPL, Jindal Stainless, Ambuja Cements, ACC, and Dalmia Bharat — combined.
Two Companies, Same Capacity, Opposite Trajectories
But the most striking contrast in our data isn't between sectors. It's between two private power companies that are nearly identical on paper and radically different in practice.
Adani Power and Tata Power both operate roughly 15,000 MW of installed generation capacity. But the similarity ends there.
A note on comparability: Adani Power reports on a standalone basis for FY 2024-25. Tata Power reports on a consolidated basis for FY 2025-26 — a different fiscal year and a different boundary. We present both trajectories because the directional contrast is meaningful, but the absolute levels are not strictly like-for-like. Readers should weigh this.
Two Companies, Opposite Trajectories
Annual emissions in million tonnes CO2e
Adani Power
15,250 MW | 100% coal
*FY23, FY24 from ESG report (not independently verified)
Tata Power
14,700 MW | mixed + renewable
Both years verified from BRSR filing
Adani Power: BRSR FY24-25 (page 328), earlier years from ESG report. Tata Power: BRSR FY25-26 (page 320). Both companies have comparable installed capacity (~15 GW).
Adani Power: The Fastest-Growing Emitter
Adani Power's verified emissions for FY 2024-25 stand at 86.4 million tonnes — making it India's second-largest corporate emitter after NTPC. Its entire fleet of 15,250 MW is coal-fired.
While earlier-year figures have not been independently verified against the original filing, the company's own ESG reports show a trajectory from approximately 49 million tonnes in FY 2022-23 to 72.9 million tonnes in FY 2023-24 — a pattern consistent with its aggressive capacity expansion.
If those earlier figures are accurate, Adani Power's emissions rose roughly 76% in two years.
Tata Power: The Sharpest Decline
Tata Power tells the opposite story. With comparable capacity of 14,700 MW, the company cut its emissions from 44.6 million tonnes in FY 2024-25 to 28.7 million tonnes in FY 2025-26 — a 36% reduction in a single year.
This is the largest verified single-year emissions decline of any company in our database. The cause is not yet established. Possible explanations include coal plant retirements, increased renewable generation, a change in consolidation scope, or lower plant load factors at Mundra. We have contacted Tata Power for clarification and will update this analysis when they respond.
Tata Power is also the only Indian power company with an SBTi-validated (Science Based Targets initiative) net zero commitment — targeting 2045, with a 70.5% reduction in Scope 1 intensity per MWh by FY 2037.
Two companies. Same installed capacity. One went up 76%. The other went down 36%. Different reporting years, different consolidation bases — but the directional contrast is stark.
The Net Zero Gap: 2035 to 2070
Every major emitter in our database has announced a net zero target. But these targets range from Reliance Industries' ambitious 2035 deadline to NTPC's 2070 — a 35-year gap.
The pattern is notable: NTPC, the single largest emitter at 352 million tonnes, has set a 2070 net zero target — matching India's national pledge rather than setting independent ambition. It carries no SBTi validation and publishes no binding interim milestones.
Net Zero Targets: A 35-Year Gap
When India's biggest emitters say they'll reach net zero. Bar width = annual emissions.
Source: Company sustainability reports and press releases. Only companies with verified emissions on our site are shown. No SBTi validation for NTPC.
By contrast, Tata Power (2045, SBTi-validated), JSW Steel (2050, SBTi-validated), and Dalmia Cement (2040, carbon-negative target) have all submitted to independent scrutiny of their decarbonisation plans.
What the Numbers Mean
India's power sector dominates its industrial emissions profile. Of the 971 million tonnes of annual CO₂ we track across verified companies, power accounts for roughly half — led overwhelmingly by coal.
Three facts emerge from the data:
Concentration is extreme.
NTPC, Adani Power, Vedanta, and Tata Steel together emit approximately 571 million tonnes — nearly 60% of everything we track across verified companies. What these four boardrooms decide matters more than what the other 100+ companies do.
Decarbonisation is a choice, not a constraint.
Adani Power and Tata Power have comparable capacity. One is adding coal. The other is retiring it. Technology isn't the bottleneck — corporate strategy is.
NTPC's 2070 target lags every private-sector peer.
NTPC — India's largest emitter at 352 Mt — matches the national 2070 pledge, carries no SBTi validation, and publishes no binding interim milestones. Every private peer in our database has set an earlier date.
Methodology Note
All figures in this story are from BRSR (Business Responsibility and Sustainability Report) filings submitted to BSE and NSE. Where marked as “verified,” we have confirmed each number against the original PDF filing, the specific page, and the Principle 6 Q7 disclosure. Sector totals and chart data include only companies whose most recent filing has verified data — matching our rankings page. Total tracked emissions (971 Mt) is the sum across all companies whose latest filing is verified. We track 110 companies total; 78 are awaiting verification of their latest filing. Full methodology
NTPC, Adani Power, and Tata Power were contacted for comment prior to publication. Any responses received will be incorporated into this analysis.
Corrections: If any figure in this story is wrong, email hello@sustainabilityforyou.com with the correct number and the source filing. We will verify, fix, and credit you in our public corrections log.
Analysis #1
Published September 20, 2026 · Sustainability For You